What regulations should the connection of steel pipes meet?

14.1.1 The metal conduit bai and wire duct must be grounded (PE) or connected to zero du (PEN) reliably, and meet the following requirements:

1 The galvanized steel conduit, flexible conduit and metal wire channel shall not be welded across the ground wire, and the connection between the two cards connected by the special ground card shall be a copper core flexible wire, the cross-sectional area shall not be less than 4mm2;

2 When the non-galvanized steel pipe is screwed, the two ends of the connection are welded to connect the ground wire; when the galvanized steel pipe is screwed, the two ends of the connection are fixed with a special grounding card;

3 The metal trunking is not used as the grounding conductor of the equipment. When the design does not require, the total length of the metal trunking should be no less than 2 locations connected to the grounding (PE) or zero-connection (PEN) trunk line;

4 The two ends of the connecting plate between the non-galvanized metal wire troughs are connected to the copper core grounding wire. The two ends of the connecting plate between the galvanized wire troughs are not connected to the grounding wire, but no less than two ends of the connecting plate have lock screw Cap or lock washer for fixing bolts.

14.1.2 Metal pipes are strictly forbidden to be welded to each other; galvanized steel pipes with wall thickness less than or equal to 2mm shall not be welded to casing.

14.1.3 Explosion-proof conduits should not be connected by reverse connection; when connection is difficult, explosion-proof unions should be used, and the joint surface should be tight.

14.1.4 When the insulation duct is buried in the trench of the masonry, it should be protected with cement mortar with a strength level not less than M10, and the thickness of the protective layer should be greater than 15mm.

14.2 General items

14.2.1 The buried depth of cable ducts laid underground shall not be less than 0.7m. Steel wire conduits with wall thickness less than or equal to 2mm shall not be buried in outdoor soil.

14.2.2 The nozzles of outdoor ducts should be set in boxes and boxes. For the pipe mouth in the floor-mounted distribution box, if there is no sealing plate at the bottom of the box, the pipe mouth should be 50 to 80 mm above the base surface. All pipes should be sealed after penetrating wires and cables. The conduit leading from the box-type substation or the floor-type distribution box to the building, the conduit nozzle on the side of the building should be located in the building.

14.2.3 The bending radius of the cable duct shall not be less than the minimum allowable bending radius of the cable. The minimum allowable bending radius of the cable shall comply with the provisions of Table 12.2.1-1 of this code. Page 37

14.2.4 The inner and outer walls of metal conduits shall be treated for corrosion; the inner walls of conduits buried in concrete shall be treated for corrosion, and the outer walls may not be treated for corrosion.

14.2.5 The duct nozzles inside the floor-standing cabinets, tables, boxes and trays should be higher than the base of the cabinets, tables, boxes and trays